Bossini spa – Montichiari plant Moulding and Metallization of Plastics At this plant energy requirements are supplied entirely by an in-house cogeneration plant. Here moulding, chromium plating, storage and assembly departments operate for all plastic products. 2007: Extension of the site with a development of a second department for the metallization of plastic components and the installation of a new technologically advanced plating plant for plastics – all compliant with requirements for Environmental Management Systems ISO 14001, being the most up-to-date and rational development in this field of application The measures taken make it possible not only to guarantee total respect for the environment, thanks to a sophisticated closed circuit water treatment plant, but also to respond to a need for constant quality in the treatment.
1990 Date of opening